Shop muck out continues. You may recall, this picture is the before. It really can deceive the viewer as to much space we actually have to work with... what a mess: Now, after sorting the mess and trying to put stuff together that belongs together, I'm well on my way to making space: It's a pain as I feel like I'm moving stuff around to move stuff around, but it's getting there and it really is my own fault anyhow. One of the main goals is to create space with, well, better utilization of the space. We are fortunate that the shop area has a fairly high ceiling to work with (open joists as well). Brenda came up with the idea to build a hanging rack from scrap 2x4's to move our long pieces of trim, moldings and tongue & groove boards: The old closet doors in the corner are going to be sent to the re-build store, but are out of the way in the corner for now. Another project (every project leads to another!) I've been putting off way too long is insulating the lower wall. An short amount of time later, voila! Insulated and sealed! The other walls need work too, but are fine for now. No more bare concrete sucking out the heat. Off tomorrow to look at a core engine.... fingers crossed!
0 Comments
Leave a Reply. |
New here? Try starting at:AuthorHusband, father and 911 dispatcher. Long time pilot with a licence that burns a hole in my pocket where my student loan money used to be. First time aircraft builder. Looking to fly my own airplane. Categories
All
Archives
June 2022
build log
|